Station 2
Wall Framing:
- Ensure the mod is level prior to framing
- Tape and snap lines for wall locations
- Cut all studs to the sizes needed
- Frame all exterior walls first
- Use hilti pins to secure lumber walls to the metal frame
- Frame the interior walls
- Add backing to the framing for drywall installation
- Add firing blocking if needed
- Frame fireplace and stairs if needed
- Plane all interior walls for drywall installation
![](https://cdn.prod.website-files.com/630d3fff5f5d7920ad609dd9/66070f32506a6e03f3465263_Station%202.png)